How to set par levels for facility supplies
A par level is the amount of an item a site should have on hand. The method is simple: measure how much the site uses, work out how much it uses while a delivery is on the way, add a small buffer, and order up to a level your shelf can hold. Review the numbers every quarter. The rest of this page is the detail and an example with real-looking numbers.
The words, and why they get mixed up
People use these terms loosely, so say which you mean in your own list:
| Term | What it means here |
|---|---|
| Par level | The amount you want on hand at a site for an item. In many systems it is the "order up to" quantity |
| Reorder point | The quantity at which you place an order. When the count falls to or below it, it is time to order |
| Minimum | A floor you do not want to fall below, often the safety buffer |
| Maximum / order-up-to | The most the shelf or the budget should hold; what an order brings you back up to |
| Lead time | The days between placing an order and having it on the shelf |
| Safety buffer | Extra stock for a busy week or a late delivery |
What you need for each item at each site
- How much it uses a week, from a real count and not a guess.
- The lead time from your supplier to that site.
- How much space the site has for it.
- How costly a run-out is: running out of can liners is a nuisance; running out of gloves can stop work.
- Shelf life, if the item expires or degrades (some cleaners and sanitizers).
The method in four steps
- Measure usage over four to eight weeks. Count what is on the shelf at the start, add what was delivered, subtract what is left at the end. Divide by the weeks. If you cannot count, use the order history for the period.
- Work out the reorder point. Reorder point = average daily usage × lead time in days + safety buffer. The first part is the stock you will use while the order is on its way; the buffer covers a busy week or a late truck. Round up to whole cases.
- Work out the order-up-to level. Order-up-to = reorder point + usage over one order cycle. If you order weekly, that is one week of use. Check it against the space; if it does not fit, order more often instead of raising the level.
- Write it down per item and per site, and give someone the job of keeping it right.
A worked example
These numbers are made up to show the arithmetic; use your own.
| Measure | Paper towels, one site |
|---|---|
| Average usage | 6 cases a week, so about 0.86 cases a day |
| Lead time | 3 days |
| Safety buffer | 3 days of usage, about 2.6 cases |
| Usage while the order is on its way | 0.86 × 3 ≈ 2.6 cases |
| Reorder point | 2.6 + 2.6 ≈ 5.2, rounded up to 6 cases |
| Order cycle | Weekly, so one week of use: 6 cases |
| Order-up-to (par) level | 6 + 6 = 12 cases |
| Space on the shelf | 14 cases, so 12 fits |
So at this site, when the count reaches 6 cases, order enough to bring it back to 12.
Adjust for the site, not just the item
A busy site and a quiet one need different numbers for the same item. A site with a seasonal peak needs a higher level before the peak and a lower one after it. A new site with no history can start from a similar site's numbers, scaled by headcount or floor area, and be corrected after a month of real counts.
Review them quarterly
Look for the signs the numbers are wrong. Run-outs or emergency orders mean the reorder point or the buffer is too low. Weeks of stock sitting unused means the par level is too high. Change one thing at a time, note the date, and look again next quarter. After a change in products, dispensers or headcount, review sooner.
Common mistakes
- Setting one level for every site.
- Setting a level from a guess instead of a count.
- Raising the level when the real fix is ordering more often.
- Forgetting the lead time, so the order arrives after the shelf is empty.
- Never reviewing, so the numbers drift from how the site is really used.
How this works in SupplyStock
In SupplyStock every item has a stock level and a reorder point, set for each site and each item. SupplyStock compares what is on hand, in transit and on order with each item's stock level, and it takes your usage in previous months into account. When an item reaches its reorder point, the software places an order that brings it back up to its stock level, so nobody at the site has to place it. An email alert shows what is on hand, in transit and on order when an item runs low. You can pause an item, replace it, or stop offering it, and the system follows.
To see what that would look like for your sites, start with the free price comparison.
Questions people ask
What is the difference between a par level and a reorder point?
The reorder point is when you order; the par level is how much you order up to. Some people use "par" for both, so write down which you mean for each item.
How many days of supply should I keep?
Enough to cover the delivery time plus a buffer you choose, within the space you have. For a daily-use item with a three-day delivery, that might be a week or so; the worked example above shows the arithmetic. It is different for every item and site.
How do I set levels for a new site with no history?
Start from a similar site's numbers, scaled by headcount or floor area, then replace them with real counts after about a month.
How often should I review par levels?
Quarterly at least, and after any change in products, dispensers, headcount or season.